Wrapping up the kids bathroom renovation for the boss (while they're on vacation in Ireland).
I still have a third shelf to place between the top and bottom shelves, under where the vessel style sink will live. But I need to wait for the plumber to finish plumbing the sink, so I know where to cut around the drain P trap. It will most likely not go from wall to wall like the top and bottom shelves, but will most likely get cut shorter and be mitered back up to the top shelf. Kind of a reverse waterfall. These shelves are milled from rough Redwood. Not the wood I'd choose for a child's bathroom. It's just so soft, that anything will leave a dent. But that's what the boss wanted.
Got the wallpaper installed, then the medicine cabinet. As well as the mirror and two floating shelves above the toilet, (toilet not yet installed). And installed the new light fixture, TP holder and shower curtain rod.
Re-purposed an old door for the pocket door.
All that's left is the middle shelf and putting on the shower curtain, which I've left off to give the plumber more room to do the shower trim out. Plumber arrives Saturday. Boss' wife and kids arrive Sunday. Boss arrives a week later.