Work on the humidor project continues and should be complete this weekend, well it sort of has to be since the presentation of the gift needs to happen Tuesday. WIth that in mind I did some more fab work on limited time at night this week making the piece for the bottom of the removable tray and doing a bunch of sanding. Precision was applied in some areas and is lacking in others, such is the nature of the things that I make.
This is the custom bottom panel for the tray. The air-flow holes are a pattern that I developed to mimic the drilled shaft foundations that we are currently installing to support the two new dry docks. The large holes are the 9 foot diameter shafts that will start installation this fall/winter and the smaller holes are the 6'-6" shafts we're in the process of installing now.
This is the bottom panel of the box complete with laser-engraved command logo.