Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 08/17/2024 in all areas

  1. I got the team hat logo designed and two prototypes of the hats made the other night. Pretty pleased with the results from the little laser. Maybe there will be d-_-b hats in the future.
    6 points
  2. I had some things to drop off at Goodwill, so I perused the $1.99 CD shelf...
    3 points
  3. Here's where it's at now... Toe kick, drawer fronts, doors, and hardware tomorrow. Countertop as well
    3 points
  4. I'm cooking breakfast, with the sultry Bobbie Gentry singing in my ear.
    2 points
  5. after all these years we have finally found a solution for the power supply modules at a rational price. which means we can make a transportable electrostatic amplifier. similar to srmxh,srm252,srm270 etc. 3 times the power, +/-400v power supplys, no obsolete components etc. designed to be mounted to the bottom as a heatsink with silicone thermal sheet in between. should be about $250 in parts unless you go nuts with the volume pot. not sure of casing yet.
    1 point
  6. For a summer, San Francisco was home to the most beautiful sound in the world
    1 point
  7. 1 point
  8. Yep, it's a complete U shape now with corner cabinets. I never updated the drawing. My son wound up doing it in the CAD software they use for the cabinets. It'll be used to assemble all the DIY electronics and work from during the day. I still have 2.5 garage bays just in case I work on anything that's too big for that room. The last bit will be to install an A/C drop and vent. Since it's summer in FL the HVAC guys are hoppin it'll probably have to wait until next month but I'll get there. The countertop will be on tomorrow.
    1 point
  9. Progress! Are you going to have a counter / work table stretched across those two corner cabinets? I would want lots of work surface, which I didn't see in your drawing.
    1 point
  10. BIg update with pics tonight... They're installing the cabinets today! In the last year it was: Framed out Electrical and network were run insulated, drywalled, and painted Mini soho network rack installed and all business class devices installed. 2.5G wired and Wi-Fi 6e (3 hardwired ceiling pucks) My son got a job at a cabinet company of all places so he had them build the cabinets and match them to the ones that are throughout the new house (wife insisted). I can finally start working on projects again after a 2 year hiatus! My first order of business is building a DAC, I sold mine and am down to a chord mojo.
    1 point
  11. One of my coworkers brought in some heirloom tomatoes to share, so pasta was on the dinner menu.
    1 point
  12. Not as Oedipal as I anticipated - but the Landing was chefs kiss. -- 🤌
    1 point
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.