June 18, 201016 yr comment_364592 OK struts... you will be chassis #4 You did not respond to my PM, so your knob will be black like the rest of it. If you want a different color knob, let me know before monday. Spritzer is going to be making engraved nameplate things... Report
June 18, 201016 yr Author comment_364594 Correction, I'll be looking into making them. Turns out the engraver I know has closed up shop so I'll have to find a new one... Report
June 18, 201016 yr comment_364606 Tube sockets arrived today. Really crappily packed - wrapped in bubble wrap, but stuffed in an ordinary large brown envelope with a string wrap seal. Envelope was disintegrating, so it could have arrived empty with the sockets somewhere between here and Hong Kong (from DIY HiFi Supply). The good news is that they thoughtfully put a customs declared value of $50 (and not $152) on, so it slipped though the radar and attracted to tax. So hats off to them for that. Nice to get one over on our tax police. The other good news is that shipping from HK to UK was only $7. Report
June 19, 201016 yr comment_364695 Correction, I'll be looking into making them. Turns out the engraver I know has closed up shop so I'll have to find a new one... I have a hammer and chisel. Ergo, I can engrave. $1.50 per character plus 20% for large fonts. Report
June 19, 201016 yr comment_364802 4 chassis and 6 knobs should ship on monday for polishing/finishing. Then in about 3 weeks when they return, the first 4 people who speak up can have them. If there is one left I will take it. Report
June 19, 201016 yr Author comment_364823 I have a hammer and chisel. Ergo, I can engrave. $1.50 per character plus 20% for large fonts. You, good sir, are hired!! Report
June 19, 201016 yr comment_364891 Those caps need to handle 600 volts DC. So anything that fits that can do that works. I have a lot of 5PF 1KV. (Mouser # 75-561r10tccv50) $0.15/pc + shipping. Report
June 21, 201016 yr comment_365278 I'll take the last two if they aren't spoken for (Not of this batch, but the last, last two ) Report
June 22, 201016 yr comment_365530 I've just been flailing around trying to avoid using the 4171G ceramic insulators, since they aren't expected in to the various stockists until the end of July (nominally). I've been talking to Kevin privately thoughout this as I reasoned things through. The result of that flailing just resulted in my spending a bit of money and stocking up the spares drawers. The short conclusion is: THERE IS NO OPTION BUT TO USE THE 4171G! I tried to use the Bergquist elastomer "alumina and beryllia replacement" with 6kV breakdown, type K10. I sourced insulating bushes with 2.54mm bush length so they went into the heatsink bracket and insulated the screw. Then I spotted the fallacy - there is still a breakdown path from the inside edge of the device mounting hole to the hole through the heatsink bracket - which is just the thickness of the washer away (0.15mm). That limits the potential to 0.15 x 3kV = 450V best case (air breaks down at 3kV/mm). Since the device tabs run up to 630V above ground this is a recipe for disaster. The nonsense is of course that Bergquist supply a TO220 bolt mounting stamping out of this material, which makes a joke out of its 6kV material specification. The alumina washers that Kevin ended up specifying are 1.78mm thick, separating the device tab and heatsink by that amount. That should hold off 1.78 x 3kV = over 5kV! Report
June 22, 201016 yr comment_365538 Thanks for doing all that research Craig, the idiots in the group definitely appreciate it! Report
June 22, 201016 yr comment_365543 I wonder if you could "persuade" Aavid to either send you samples (was it 60 of them ), or sell them direct to you? I would guess your credentials are good enough that it might work. Heat sink producer Aavid Thermalloy - World Leader in Thermal Management Report
June 22, 201016 yr comment_365547 I wonder if you could "persuade" Aavid to either send you samples (was it 60 of them ), or sell them direct to you? I would guess your credentials are good enough that it might work. Heat sink producer Aavid Thermalloy - World Leader in Thermal Management Well, that is not a bad idea. So I've filled out the form, to be assessed by a "sales associate". Lets see.... Report
June 22, 201016 yr comment_365548 Knobs are going to be $35 each with the anodizing ( i used a big chunk of aircraft aluminum) and machined them .0001 per pass. Report
June 22, 201016 yr comment_365549 Perhaps give Arrow a ring. They show it out of stock, but they've always been able to work with me on minimum order quantities (I notice that Digikey has a 6000 MOQ) Report
June 22, 201016 yr comment_365660 dact mounting bracket (or other pot) http://gilmore.chem.northwestern.edu/dactmtg2.jpg Report
June 22, 201016 yr comment_365669 Thanks for doing all that research Craig, the idiots in the group definitely appreciate it! Did someone call my name? Report
June 23, 201016 yr comment_365870 Just RE-ordered the 4171G from Future. Except this time I've ordered 200 of the suckers - having spotted the voltage weakness around the bolt hole I have no intention of running out of them soon. Report
June 23, 201016 yr comment_365907 Hokay, finished the boards. Remaining is: 1. Japanese semiconductors - expected early next week 2. Transformers. Being built by Paul Houlden, ex MD of Avel Lindberg and supplier to Krell and other high end manufacturers. Cores are on order, so finished transformers should be around 3 weeks delivery. Primary specced at 240V 50Hz and his design regulation is 7%, centre potted fixings. Any other T2 builders in 240V territories who are interested, let me know and I'll put you directly in touch. 3. Ceramic insulators. 4. Casework. Here's a pic of the stuffed boards http://www.tech-enterprise.com/tekstuff/T2stuffedboards.JPG Report
June 23, 201016 yr comment_365938 I now have 9 sets of heatsinks done, 15 sets of fronts/backs done 8 sets of tops/bottoms done (in addition to the 3 sets of everything already shipped) going to do 6 knobs tomorrow and a bunch of stax jacks (5 and 6 pin) next week. 2 chassis with knobs should go out for finishing on friday or monday. Spritzer gets a different color knob. Only thing left to do is measure for and make the mounting brackets for the DACT. Unless i decide to do something stupid like making aluminum feet. Or titanium feet, or some other very silly thing. Gold/platinum with or without diamonds available special order Would you write or engrave your autograph with production number on the bottom of the knob? Report
June 23, 201016 yr comment_365952 I'm not even in the running for a T2, yet I'm interested in the volume knob. Is that wrong? Report
June 23, 201016 yr comment_365955 I'm not even in the running for a T2, yet I'm interested in the volume knob. Is that wrong? lusting after knobs is perfectly fine around here... NTTIAWWT... Report
June 23, 201016 yr comment_365956 I'm not even in the running for a T2, yet I'm interested in the volume knob. Is that wrong? Are you looking for a Knob to Polish? Report
Join the conversation