Yesterday, removed half the sod to clear a 14' x 16' tract of land. For context, that took about two and half hours.
This morning, continued to remove sod to clear the rest of the area. Took about an hour since I'd already used the edger to cut the sod into roughly 1' square pieces.
Project then moved from demolition to construction, which involved raking and grading the area. Then moved approximately 5,000# of crushed stone by hand along with installing permeable paving forms to make Lily a parking space beside the driveway.
Grandma and grandpa chipped in.
The somewhat rough finished project. I did a bit more raking/sweeping to level it out and smooth the high spots. The paver box-out in the back is for an irrigation control valve that was annoyingly just at the edge of the excavation.